Week 7 – plumbing and electrical

Got our outer foil wrap yesterday, as well as all the plumbing. This morning the sparky was on site roughing in the electrics.

2015-03-18 08.45.03 (Medium)

2015-03-18 16.12.42 (Medium)

Bath hobs were also built this week:

2015-03-20 17.57.40 (Medium)

Just before the insulation went in the walls, a mate and I took the opportunity to run a ton of cat6, plus speaker cable and coax in the theatre. Stud mount brackets directly opposite the sparky’s work, as well as a ton of photos and measurements should make it easy to fit off later.

2015-03-22 21.59.20 (Medium)

Quite a bit of cable running to the garage. This was only part way thru, I think we ended up with 26 runs all up.

2015-03-22 13.10.47 (Medium)

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s