Weeks 5 and 6 – windows, gutters, roof

Windows, stacker doors, gutters and roof all delivered and installed. Things are flying!

10171818_10153157505617152_2172787738668863480_n

Timber windows for the big ones – all double glazed.

13905_10153157505507152_5196144388862636081_n

Gutters and temp downpipes

2015-03-12 19.48.41 (Medium)

Windows are fitted, as well as timber stacker sliding doors to alfresco.

We finally got to see our Colorbond choice Basalt on a large scale (it was new at the time when we chose it, so no big examples to go by).

2015-03-12 19.32.18 (Medium)

Roof material delivery

2015-03-17 15.59.41 (Medium)

Roof done!

Also we got a shitload of plasterboard delivered. 3400kg to be exact:

11007720_10153160759412152_179848817206315765_n

Plumbing and electrical should be next.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s