Build locked in

Now that the land contract is done, we went to lock in the build today. Read through our quote in detail and made a few minor changes along the way (does it ever end?!)

But it’s now underway and we’re officially a customer 🙂 We’ll be assigned an admin contact in around a week’s time and will set up our colour and electrical appointments.

wpid-20140216_111943.jpg

Land contract: done

The land contract went to our conveyancer on Monday and everything checks out, so we signed it with the developer this afternoon.

We are officially one step closer to being home (land) owners!

Expensive ream of paper

Expensive ream of paper

Floor plan and variations

Some of the stuff we’re hopefully including in our build;

  • Upgrade to 9′ ceiling height, 8′ door height and square set cornice
  • Timber floating floorboards
  • Bath to ensuite option
  • Shower niches
  • Extend walk in pantry and add cavity sliding door
  • Double glazed windows
  • Single entrance to theatre (standard floor plan has one each side)
  • Delete bulkheads in doorways
  • Undermount sink, pot/bin drawers
  • Lots more power points
  • Lots of LED downlights

How much of this is affordable/achievable we’re not sure yet 🙂

Our customised floor plan looks something like this:

Customised Monaco floor plan

Customised Monaco floor plan

Just need to get our land contract signed and then we can get moving!